The Director of Housing submitted a report
outlining the Council’s strategic approach and operational performance
regarding health and safety (H&S) compliance across housing stock.
Key points included:
- This was the first
comprehensive oversight on housing stock and steps were taken to ensure
residents were safe and that health and safety was the highest priority.
- The reports
were based on Key Performance Indicators (KPI)
- There was a
compliance framework designed to mitigate risk.
- All
performance issues went through scrutiny and tenants’ scrutiny.
- There was a
requirement to maintain accurate records.
- Evidence was
collected on people-centric metrics, and evidence was provided every month
on meeting outcomes.
- It was aimed
to demonstrate 100% compliance across the stock.
- Gas risk was
the highest, so 100% compliance was needed.
- During
checks, a full service of boilers and heating systems was completed.
- Engineers
checked smoke and carbon monoxide alarms.
- Risks such as
leaks were undertaken to ensure properties were safe.
- Performance
figures were set out in the report.
- In terms of
next steps, there was an operational strain around access since people
were often not home for appointments.
Tenancy engagement was being conducted for hard-to-access cases.
- In terms of
compliance, proactive communications were being conducted with tenants,
and an access strategy was being undertaken. It was being looked at how tenants could
be supported to help them understand safety.
- Regarding
electrical safety, since April 2024, it had been mandatory for Local
Authorities to carry out a five-year cyclical testing programme known as
the EICR that identified faults, fixes and compliance. Critical repairs had been undertaken. In terms of assurance, the EICR
programme had been implemented with an aim to reach 100% compliance by
2028.
- Communal
space compliance was at 99%
- Over 2900
rewires had been undertaken over a five-year period.
- Minor work
certificates had been issued.
- 99.8% of
immediate danger reports had been done within the timescale.
- Additional
budget had been allocated in 2025/26 to help establish a dedicated
electrical safety team.
- There was a
national shortage of electricians. There
was a mixed delivery model of in-house and contractors to meet needs and
the service was working to be fully compliant by 2028.
- All communal
spaces had been inspected. All
surveys had been completed and an annual re-inspection programme had been
started which implemented the risk model. The Tenants’ Scrutiny Panel
would be reported to on this.
- Surveys were
carried out regarding the ongoing management of asbestos.
- Fire Safety
was managed based on risk and the information needed for this was all in
place. Policies were in place on
how properties were managed.
- All blocks
had inspections on communal spaces, the frequency of this was based on
risk.
- Fire risk
assessments were carried out and Leicestershire Fire and Rescue were
worked with. The Council had never
required enforcement action to be taken against it.
- In terms of
water hygiene, a legionella risk assessment of communal water tanks was
conducted. There were only 36 water
tanks in council stock, mostly in sheltered housing, and all of these were
100% compliant. Most housing stock
was mains-fed. All required
properties had legionella risk assessments.
- Passenger
lifts had annual inspections, and lifts that saw a lot of use were
serviced every month.
In discussions with Members, the following was
noted:
- With regard to a query
about learning from other Councils on access issues, it was noted that
other councils had been worked with in terms of communicating and
educating. In the last six months,
the access rate had improved. It
was acknowledged that tenants often had other priorities, and they were
worked with on this. Reminders were
sent and they were checked on. The
overall access strategy could help the division to engage with tenants to
ascertain where they needed further support. Support workers were in place with Adult
Social Care teams and there was also an income management team. Work was done to triangulate information
across repairs and compliance checks and to get a strategy in place going
forward. Getting access at the same
time for all checks was being worked towards.
- In response to a point
raised about lifts being out of actions, it was noted that a condition
survey had been done on all lifts, with information on breakdowns to
inform the renewals programme to see where lifts were coming to the end of
their economic life and needed to be replaced. Officers could be contacted directly
with regard to individual cases. A
lift repair company had been procured through Estates and Buildings Services
who had a response time of two hours for entrapments.
- With regard to a query
about management structure, it was noted that Heads of Services were very
busy and recruitment was under way to replace one who had recently
left. It was necessary to look at
the structure that had been set up in terms of additional
responsibilities. There would be a
repairs lead, technical lead and compliance lead and the division were
also recruiting for an additional post to increase the capacity of the
Senior Management Team. A business
case was being put together to get a specialist on Housing delivery.
- In terms of risks not
covered by the EICR, there was a Head of Service for tenancy who was doing
communications on safety, including for electrical equipment. Work was done with the fire service, and
if a trend in risks was identified, they would contact the council.
- The team were commended for
taking their work seriously.
AGREED:
1)
That the report be noted.
2)
That comments made by members of
this commission to be taken into account.