The Director of Housing submitted a report outlining
the Council’s strategic approach and operational performance
regarding health and safety (H&S) compliance across housing
stock.
Key points included:
- This was the first comprehensive oversight on housing stock and
steps were taken to ensure residents were safe and that health and
safety was the highest priority.
- The reports were based on Key Performance Indicators
(KPI)
- There was a compliance framework designed to mitigate
risk.
- All performance issues went through scrutiny and tenants’
scrutiny.
- There was a requirement to maintain accurate
records.
- Evidence was collected on people-centric metrics, and evidence
was provided every month on meeting outcomes.
- It was aimed to demonstrate 100% compliance across the
stock.
- Gas risk was the highest, so 100% compliance was
needed.
- During checks, a full service of boilers and heating systems was
completed.
- Engineers checked smoke and carbon monoxide alarms.
- Risks such as leaks were undertaken to ensure properties were
safe.
- Performance figures were set out in the report.
- In terms of next steps, there was an operational strain around
access since people were often not home for
appointments. Tenancy engagement was
being conducted for hard-to-access cases.
- In terms of compliance, proactive communications were being
conducted with tenants, and an access strategy was being
undertaken. It was being looked at how
tenants could be supported to help them understand
safety.
- Regarding electrical safety, since April 2024, it had been
mandatory for Local Authorities to carry out a five-year cyclical
testing programme known as the EICR that identified faults, fixes
and compliance. Critical repairs had
been undertaken. In terms of assurance,
the EICR programme had been implemented with an aim to reach 100%
compliance by 2028.
- Communal space compliance was at 99%
- Over 2900 rewires had been undertaken over a five-year
period.
- Minor work certificates had been issued.
- 99.8% of immediate danger reports had been done within the
timescale.
- Additional budget had been allocated in 2025/26 to help
establish a dedicated electrical safety team.
- There was a national shortage of electricians. There was a mixed delivery model of in-house and
contractors to meet needs and the service was working to be fully
compliant by 2028.
- All communal spaces had been inspected. All surveys had been completed and an annual
re-inspection programme had been started which implemented the risk
model. The Tenants’ Scrutiny Panel would be reported to on
this.
- Surveys were carried out regarding the ongoing management of
asbestos.
- Fire Safety was managed based on risk and the information needed
for this was all in place. Policies
were in place on how properties were managed.
- All blocks had inspections on communal spaces, the frequency of
this was based on risk.
- Fire risk assessments were carried out and Leicestershire Fire
and Rescue were worked with. The
Council had never required enforcement action to be taken against
it.
- In terms of water hygiene, a legionella risk assessment of
communal water tanks was conducted.
There were only 36 water tanks in council stock, mostly in
sheltered housing, and all of these were 100%
compliant. Most housing stock was
mains-fed. All required properties had
legionella risk assessments.
- Passenger lifts had annual inspections, and lifts that saw a lot
of use were serviced every month.
In discussions with Members, the following was
noted:
-
With regard to a query about learning from other
Councils on access issues, it was noted that other councils had
been worked with in terms of communicating and
educating. In the last six months, the
access rate had improved. It was
acknowledged that tenants often had other priorities, and they were
worked with on this. Reminders were
sent and they were checked on. The
overall access strategy could help the division to engage with
tenants to ascertain where they needed further support. Support workers were in place with Adult Social
Care teams and there was also an income management
team. Work was done to triangulate
information across repairs and compliance checks and to get a
strategy in place going forward.
Getting access at the same time for all checks was being worked
towards.
-
In response to a point raised about lifts being out
of actions, it was noted that a condition survey had been done on
all lifts, with information on breakdowns to inform the renewals
programme to see where lifts were coming to the end of their
economic life and needed to be replaced. Officers could be contacted directly with regard
to individual cases. A lift repair
company had been procured through Estates and Buildings Services
who had a response time of two hours for entrapments.
-
With regard to a query about management structure,
it was noted that Heads of Services were very busy and recruitment
was under way to replace one who had recently left. It was necessary to look at the structure that had
been set up in terms of additional responsibilities. There would be a repairs lead, technical lead and
compliance lead and the division were also recruiting for an
additional post to increase the capacity of the Senior Management
Team. A business case was being put
together to get a specialist on Housing delivery.
-
In terms of risks not covered by the EICR, there was
a Head of Service for tenancy who was doing communications on
safety, including for electrical equipment. Work was done with the fire service, and if a
trend in risks was identified, they would contact the
council.
-
The team were commended for taking their work
seriously.
AGREED:
1)
That the report be noted.
2)
That comments made by members of this
commission to be taken into account.